top of page
PLOT 8 CASTLEWOOD DASHBOARD
PLOT 8 CASTLEWOOD DASHBOARD
PLOT 8 CASTLEWOOD DASHBOARD
Log In
Login
Main Dashboard
1. Health & Safety File
2.1 Planning & Environmental
2.2 Site Investigation Reports
2.2.6 - Drainage Report & Videos
3. Manuals and Drawings
4. PC Handover File
5. Aftercare Plan
6. Training & Demonstration Videos
7. QR Codes
FAQ
Contact
Calendar
File Search
SECTION 1
HEALTH & SAFETY FILE
1.1
INTRODUCTION AND LEGAL DUTIES
1.2
AMENDMENT RECORD
1.3
DESCRIPTION OF WORKS AND DESIGN CRITERIA
1.4
FIRE DETECTION AND OCCUPIERS FIRE STRATEGY
1.5
RESIDUAL HAZARDS AND PROVISION FOR SAFE ACCESS
1.6
INCOMING PLANS TO SITE DRAWINGS AND EMERGENCY CONTACTS
1.7
REMOVAL OR DISMANTLING OF INSTALLED PLANT EQUIPMENT
bottom of page